Is there a continuous application method or are there certain application periods (time-frames), when a huge wave of project proposals are to be managed?
It is up to the bidder to propose appropriate modalities for the programme, including the conditions for open calls and the timeframe for project selection.
These modalities will be assessed under award criterion 3.3 described in section 5.3 of the Terms of Reference.
For tips on the timeline of calls for proposals, see guidance in section 10.3 of the Fund Operator Manual.